The price depends on your needs. Send a quote request with your company budget; we will adjust to it.

Request a quoteChat on WhatsApp

Building a two-storey house involves more critical work: the concrete structure, floor-slab casting, stairs and waterproofing upstairs. The turnkey two-storey house package makes ALLMAR Construction responsible for materials, labour and quality together, following the structural drawings and cost plan you approve.

Included

  • All materials to the written specification in the cost plan (type, brand or equivalent, size) from foundations to finishes
  • Trades, helpers, foreman and site supervisor
  • Purchasing, transporting and storing materials on site
  • Tools, concrete mixers, scaffolding and formwork as needed
  • Samples of finishing materials (tiles, paint, sanitary ware) for your approval before installation
  • Electrical, clean-water and wastewater installation as drawn
  • Photo progress reports and final cleaning
  • A maintenance period after handover as stated in the contract

Not included

  • PBG building approval and SLF certificate of occupancy (separate service)
  • New PLN electricity, PDAM water and gas connection fees
  • Loose furniture, kitchen sets, air-conditioners, curtains and other interiors not listed in the cost plan
  • Work outside the drawings; priced through a signed variation (add/omit) record
  • Major site preparation, retaining walls, boundary fences and gardens, unless listed in the cost plan
  • Design and working drawings if you do not have them yet (ALLMAR can prepare them as a separate service)

Steps

  1. Consultation: You tell us the plot size, rooms needed, preferred style and budget range.
  2. Site survey: ALLMAR checks the soil, truck access for deliveries, site water and power, and neighbouring buildings.
  3. Full cost plan: The cost plan itemises every task with quantities, material specifications and the price per m², so you can compare and fit it to your budget.
  4. Contract: Scope, specifications, schedule, progress-based payment stages, variations and the maintenance period are put in writing.
  5. Construction: ALLMAR supplies the materials and builds every stage, with finishing samples approved by you and photo progress reports.
  6. Handover: Joint inspection, snag fixing, a signed handover record (BAST), then the maintenance period begins.

Price

From Rp5.300.000/m² (standard specification). The final price per m² is set after the site survey and drawings, itemised in a written cost plan (RAB) and fitted to your budget. Use "Request a quote" to book the survey.

Other house-building packages

PackageMaterialsPriceBest when
Single-storey house building - labour only (materials by owner)Bought by ownerfrom Rp2.000.000/m²You have materials or a trusted supply store; a simple house
Two-storey house building - labour only (materials by owner)Bought by ownerfrom Rp2.500.000/m²You want to control material purchasing; a two-storey house
Single-storey house building - turnkey, materials includedSupplied by ALLMARfrom Rp4.500.000/m²You want it done without handling materials
Two-storey house building - turnkey, materials included (this page)Supplied by ALLMARfrom Rp5.300.000/m²You want one party responsible for a multi-storey structure

PBG and SLF

The package does not include the Building Approval (PBG) or the Certificate of Occupancy (SLF). Under Government Regulation 16/2021, a house needs a PBG before construction starts, applied for through the SIMBG system with drawings that match what will be built. ALLMAR can handle it as a separate service: PBG and SLF at ALLMAR Law & Permit. Let us know your PBG status during the consultation so the drawings and schedule line up.

Full explanation and FAQ at ALLMAR Construction →