Construction · House Building Packages

Two-storey house building - labour only (materials by owner)

Store/Construction/Paket Bangun Rumah/Two-storey house building - labour only (materials by owner)

Jasa bangun rumah 2 lantai - borongan tenaga (tanpa bahan)

Price: From Rp2.500.000/m²

The price depends on your needs. Send a quote request with your company budget; we will adjust to it.

Request a quoteChat on WhatsApp

A two-storey house demands more structural care than a single-storey one: column and beam reinforcement, slab formwork, deck casting and stairs. With the labour-only package for a two-storey house, you supply the materials and ALLMAR provides a crew used to multi-storey structures, under technical supervision.

Included

  • Masons, steel fixers, carpenters or light-steel installers, painters and helpers as scheduled
  • A foreman who organises the daily work on site
  • ALLMAR technical supervision: dimensions, levels, reinforcement checks before casting, and workmanship
  • A material list for each stage (type, size and estimated quantity) at least a week before it is needed
  • Inspection of materials delivered to site before they are used
  • The trades’ hand tools (trowels, spirit levels, saws, drills, grinders and similar)
  • Photo progress reports and measured work (opname) as the basis for each payment stage
  • Clearing work debris from the building area at handover

Not included

  • All building materials: cement, sand, stone, steel, bricks or AAC blocks, timber, light steel, roof tiles, ceramics, paint, pipes, cables, frames, doors and windows
  • Hire of heavy equipment, concrete mixers, vibrators and scaffolding, unless agreed in the cost plan
  • Site water and the temporary power connection
  • Design, working drawings and structural calculations (available as separate services)
  • PBG building approval and SLF certificate of occupancy
  • Demolition of an existing building, major filling and retaining walls, unless listed in the cost plan
  • New PLN electricity and PDAM water connection fees

Steps

  1. Consultation: You tell us the plot size, rooms needed, budget and any materials you already have.
  2. Site survey: ALLMAR checks the soil, access road, site water and power, and neighbouring buildings.
  3. Labour cost plan and material list: We prepare the labour price per m² and the stage-by-stage material list you will buy.
  4. Contract: Scope, schedule, payment stages based on measured progress, and what happens when materials are late are put in writing.
  5. Construction: The trades work under ALLMAR’s foreman and supervisor, with photo reports and reminders of the materials needed next.
  6. Handover: Joint inspection, snag fixing, then a signed handover record (BAST).

Price

From Rp2.500.000/m² (standard specification). The final price per m² is set after the site survey and drawings, itemised in a written cost plan (RAB) and fitted to your budget. Use "Request a quote" to book the survey.

Other house-building packages

PackageMaterialsPriceBest when
Single-storey house building - labour only (materials by owner)Bought by ownerfrom Rp2.000.000/m²You have materials or a trusted supply store; a simple house
Two-storey house building - labour only (materials by owner) (this page)Bought by ownerfrom Rp2.500.000/m²You want to control material purchasing; a two-storey house
Single-storey house building - turnkey, materials includedSupplied by ALLMARfrom Rp4.500.000/m²You want it done without handling materials
Two-storey house building - turnkey, materials includedSupplied by ALLMARfrom Rp5.300.000/m²You want one party responsible for a multi-storey structure

PBG and SLF

The package does not include the Building Approval (PBG) or the Certificate of Occupancy (SLF). Under Government Regulation 16/2021, a house needs a PBG before construction starts, applied for through the SIMBG system with drawings that match what will be built. ALLMAR can handle it as a separate service: PBG and SLF at ALLMAR Law & Permit. Let us know your PBG status during the consultation so the drawings and schedule line up.

Full explanation and FAQ at ALLMAR Construction →